Shaft Mine L1: Difference between revisions

From The Colonists
Jump to navigation Jump to search
Tarkhubal (talk | contribs)
Created page with "{{Building infobox | title = Shaft Mine L1 | image = Building_ShaftMine_L1.png | mod-id = 51 | group= Resource Collection | resources = 8x Planks | construction-time =..."
 
No edit summary
 
(5 intermediate revisions by 2 users not shown)
Line 7: Line 7:
| construction-time = 2 days
| construction-time = 2 days
| input = 2x [[Energy L2]] per day
| input = 2x [[Energy L2]] per day
| output = Stone, Clay, Iron Ore, Coal
| output = [[Stone]], [[Clay]], [[Iron Ore]] or [[Coal]]
| daily-output = Produces 4x Stone per day, 2.7x Clay, Iron Ore, Coal per day
| daily-output = Produces 4x [[Stone]] per day <br> 2.7x [[Clay]], [[Iron Ore]], [[Coal]] per day
| requirements = None
| requirements = [[Construction I]], [[Mining I]]
}}
}}


[[Shaft Mine L1]] is a [[Building]] that extract [[Stone]], [[Clay]], [[Iron Ore]] and [[Coal]] from [[Mines]] using [[Energy L2]]
[[Shaft Mine L1]] is a [[Building]] that extract [[Stone]], [[Clay]], [[Iron Ore]] and [[Coal]] from [[Natural_Resource|Stone Underground Deposits]], [[Natural_Resource|Clay Underground Deposits]], [[Natural_Resource|Iron Ore Underground Deposits]] and [[Natural_Resource|Coal Underground Deposits]] using [[Energy L2]]

Latest revision as of 00:28, 22 December 2022

Shaft Mine L1
Shaft Mine L1
Basic information
Mod ID: 51
Group: Resource Collection
Construction information
Resources: 8x Planks
Construction time: 2 days
Production information
Input: 2x Energy L2 per day
Output: Stone, Clay, Iron Ore or Coal
Daily-output: Produces 4x Stone per day
2.7x Clay, Iron Ore, Coal per day
Research information
Requirements: Construction I, Mining I

Shaft Mine L1 is a Building that extract Stone, Clay, Iron Ore and Coal from Stone Underground Deposits, Clay Underground Deposits, Iron Ore Underground Deposits and Coal Underground Deposits using Energy L2